School Update


The school has had the grounds resurfaced with TIger Turf, and it is looking great.


Our Small grassed area now has irrigation installed, which allows the grass to continue growing throughout the summer months.


The renovations of the Admin block had begun.


The school roll is now in excess of 150 students, as a result, we now have to implement a "Waiting List" policy for future enrolments.